Volumen 1

Volumen 1 (Volumen 2)
Sección Familia
ER Erosion Control
PCCP Portland Cement Concrete Pavement
PCCPR Portland Cement Concrete Pavement Restoration
MPD Miscellaneous Pavement Details
MBPD Miscellaneous Bituminous Pavement Details
MCPD Miscellaneous Concrete Pavement Details
BSS Shelters
RCP Reinforced Concrete Pipe Installation Methods
PVCP PVC Pipe Installation Methods
PEP Corrugated PE Pipe Installation Method
DR Drainage
MB Metal Barrier
CB Concrete Barrier
LS Highway Lighting
IA Impact Attenuators
DLN Markers and Delineators
PL Planting
TUST Turf Establishment
MPT Maintenance and Protection of Traffic

Erosion Control

Date Drawing # Drawing Title
Oct-1998 ER 1 Devices
Silt Fence
Oct-1998 ER 2 Devices
Straw Bales
Oct-1998 ER 3 Devices
Silt Fence with Straw Bale Dike
May-1998 ER 4 pH Calculation
Lime Requirements for Acid Soils
May-1998 ER 5 pH Calculation
Lime Requirements for Acid Soils
May-1998 ER 6 pH Calculation
Lime Requirements for Acid Soils
May-1998 ER 7 pH Calculation
Lime Requirements for Acid Soils
Oct-1998 ER 17 Slope Protection
Plastic Liner Installation

Regresar al Comienzo de la página

 

Portland Cement Concrete Pavement

Date Drawing # Drawing Title
Apr-1996 PCCP 1 Typical Sections
Apr-1996 PCCP 2 Shoulders Typical Sections Types A, B and C
Apr-1996 PCCP 3 Typical Median Sections
Dec-1998 PCCP 4 Joint Details
Apr-1996 PCCP 5 Pavement Drain Details
May-1998 PCCP 6 AC and DC Lanes
Jul-2000 PCCP 6A Approved List

Regresar al Comienzo de la página

 

Portland Cement Concrete Pavement Restoration

Date Drawing # Drawing Title
May-1999 PCCPR 1 PCC Pavement Restoration Installation of Steel Dowel and Tie Bars
May-1999 PCCPR 2 PCC Pavement Restoration Joint Details
May-1998 PCCPR 3 PCC Pavement Restoration Partial Depth Patching
May-1999 PCCPR 4 PCC Pavement Restoration Slabjacking and undersealing
Jul-2000 PCCPR 4A Approved List

Regresar al Comienzo de la página

 

Miscellaneous Pavement Details

Date Drawing # Drawing Title
Feb-2000 MPD 1 Typical Pavement Sections Widening

Regresar al Comienzo de la página

 

Miscellaneous Bituminous Pavement Details

Date Drawing # Drawing Title
Mayo-2010 MBPD 01 Notes for Transition to Bituminous Pavements and Structures
Mayo-2010 MBPD 02 Details for Transition to Bituminous Pavements and Structures Type 1
Mayo-2010 MBPD 03 Details for Transition to Bituminous Pavements and Structures Type 2
Mayo-2010 MBPD 04 Details for Transition to Bituminous Pavements and Structures Type 3
Mayo-2010 MBPD 05 Details for Transition to Bituminous Pavements and Structures Type 4
Mayo-2010 MBPD 06 Details for Transition to Bituminous Pavements and Structures Type 4
Mayo-2010 MBPD 07 Details for Transition to Bituminous Pavements and Structures Type 5
Mayo-2010 MBPD 08 Details for Transition to Bituminous Pavements and Structures Type 5
Mayo-2010 MBPD 09 Details for Transition to Bituminous Pavements and Structures Type 6
Mayo-2010 MBPD 10 Details for Transition to Bituminous Pavements and Structures Type 6
Mayo-2010 MBPD 11 Details for Transition of Bituminous Pavements and Structures Type 7
Mayo-2010 MBPD 12 Placing Sequence of Bituminous Course Type 7
Mayo-2010 MBPD 13 Details for Transition of Bituminous Pavements and Structures Type 8
Mayo-2010 MBPD 14 Placing Sequence of Bituminous Course Type 8

Regresar al Comienzo de la página

 

Miscellaneous Concrete Pavement Details

Date Drawing # Drawing Title
Mayo-2010 MCPD 01 Notes for Transition to Concrete Pavements and Structures
Mayo-2010 MCPD 02 Details for Transition to Concrete Pavements and Structures Type 1
Mayo-2010 MCPD 03 Details for Transition to Concrete Pavements and Structures Type 2
Mayo-2010 MCPD 04 Details for Transition to Concrete Pavements and Structures Type 3
Mayo-2010 MCPD 05 Details for Transition to Concrete Pavements and Structures Type 4
Mayo-2010 MCPD 06 Details for Transition to Concrete Pavements and Structures Type 4
Mayo-2010 MCPD 07 Details for Transition to Concrete Pavements and Structures Type 5
Mayo-2010 MCPD 08 Details for Transition to Concrete Pavements and Structures Type 5
Mayo-2010 MCPD 09 Details for Transition to Concrete Pavements and Structures Type 6
Mayo-2010 MCPD 10 Details for Transition to Concrete Pavements and Structures Type 6
Mayo-2010 MCPD 11 Details for Transition to Concrete Pavements and Structures Type 7
Mayo-2010 MCPD 12 Details for Transition to Concrete Pavements and Structures Type 8
Mayo-2010 MCPD 13 Details for Transition to Concrete Pavements and Structures Type 9
Mayo-2010 MCPD 14 Details for Transition to Concrete Pavements and Structures Type 10
Mayo-2010 MCPD 15 Details for Transition to Concrete Pavements and Structures Type 11
Mayo-2010 MCPD 16 Details for Transition to Concrete Pavements and Structures Type 12
Mayo-2010 MCPD 17 Details for Transition to Concrete Pavements and Structures Type 12
Mayo-2010 MCPD 18 Details for Transition to Concrete Pavements and Structures Type 13
Mayo-2010 MCPD 19 Details for Transition to Concrete Pavements and Structures Type 13
Mayo-2010 MCPD 20 Details for Transition to Concrete Pavements and Structures Type 14
Mayo-2010 MCPD 21 Details for Transition to Concrete Pavements and Structures Type 14

Regresar al Comienzo de la página

 

Shelters

Date Drawing # Drawing Title
Oct-1997 BSS 1 Bus Stop Shelter Construction details
Oct-1997 BSS 2 Bus Stop Shelter Construction details

Regresar al Comienzo de la página

 

Reinforced Concrete Pipe Installation Methods

Date Drawing # Drawing Title
Apr-1996 RCP 1 Reinforce Concrete Pipe Installation Methods
Apr-1996 RCP 2 Embankment Beddings
Apr-1996 RCP 3 Trench Beddings
Aug-1999 RCP 4 Allowable Height of Fill Above Top of Circular Concrete Pipe

Regresar al Comienzo de la página

 

PVC Pipe Installation Methods

Date Drawing # Drawing Title
May-1998 PVCP 1 Negative Projection and Trench Method

Regresar al Comienzo de la página

 

Corrugated PE Pipe Installation Method

Date Drawing # Drawing Title
Jul-2000 PEP 1 Installation Method Negative projection and trench method
Sep-1996 PEP 2 Polyethylene End Section

Regresar al Comienzo de la página

 

Drainage

Date Drawing # Drawing Title
Dec-2000 DR 1 Approved List of Cast Iron Manufacturers and Products
Dec-1998 DR 2 Slotted Pipe and Installation Details
Dec-1998 DR 3 Manhole for Slotted Pipe
from 18 Ø to 36 Ø
Dec-1998 DR 4 Slotted Pipe and Installation Details
for Existing Conditions
Dec-1998 DR 5 Manhole for Slotted Pipe on Existing
Conditions from 18 Ø to 36 Ø
Dec-1998 DR 6 Inlet Type 1
from 18 Ø to 30 Ø
Bicycle grate
Dec-1998 DR 7 Inlet Type 1
from 18 Ø to 30 Ø
Alternate grate
Dec-1998 DR 8 Inlet Type 1A
from 36 Ø to 48 Ø
Alternate grate
Dec-1998 DR 9 Inlet Type 1A
from 36 Ø to 48 Ø
Bicycle grate
Dec-1998 DR 10 Inlet Type 2
from 18 Ø to 30 Ø
Dec-1998 DR 11 Inlet Type 2A
from 36 Ø to 48 Ø
Dec-1998 DR 12 Inlet Type 3
from 18 Ø to 30 Ø
Dec-1998 DR 13 Inlet Type 3A
from 36 Ø to 48 Ø
Dec-1998 DR 14 Inlet Type 4
from 18 Ø to 30 Ø
Dec-1998 DR 15 Inlet Type 4A
from 36 Ø to 48 Ø
Dec-1998 DR 16 Inlet Type 5
(Depressed Grass Median)
Dec-1998 DR 17 Precast
Curb Drains
Dec-1998 DR 18 Bridge End Inlets
Dec-1998 DR 19 Precast Concrete End Section
Dec-1998 DR 20 Metal End Sections
Dec-1998 DR 21 Reinforced Concrete
Headwalls Type A and B
Dec-1998 DR 22 Transversable Headwall Type C with Load-Carrying Grate
Dec-1998 DR 23 Headwall Type D
Dec-1998 DR 24 Manhole Adjustments
Dec-1998 DR 25 Manhole Adjustments
Oct-2000 DR 25A Manhole Adjustments
Manufactured by Andrews Metal Products
Oct-2000 DR 25B Manhole Adjustments
Manufactured by Andrews Metal Products
Oct-2000 DR 25C Manhole Adjustments
Manufactured by Andrews Metal Products
Oct-2000 DR 25D Manhole Adjustments
Manufactured by Andrews Metal Products
Dec-1998 DR 26 Typical Curbs

Regresar al Comienzo de la página

 

Metal Barrier

Date Drawing # Drawing Title
Sep-2009 MB 1 W-Beam Strong Post
Hardware
Sep-2009 MB 2 W-Beam Strong Post
Hardware
Sep-2009 MB 3 W-Beam Strong Post
Hardware
Sep-2009 MB 4 W-Beam Strong Post
Hardware
May-1998 MB 5 W-Beam Strong Post
Hardware
Feb-1997 MB 5A W-Beam Strong Post
Hardware
Feb-1997 MB 6 W-Beam Strong Post
Single Face
Assembly & Elevation Details
Dec-2000 MB 6A W-beam strong-post
Timber blockout details
Dec-2000 MB 6B W-Beam Strong Post
Plastic blockout details
Dec-2000 MB 6C W-Beam Strong Post -Plastic Blockout Details
Dec-2000 MB 6D W-Beam Strong-Post
Plastic blockout details
Feb-1997 MB 7 W-Beam Strong Post
Highway Lighting
Feb-1997 MB 8 W-Beam Strong Post
Single Face
Terminal Type MA
Oct-1997 MB 9 W-Beam Strong Post
Single Face
Terminal Type MB
Sep-2009 MB 10 W-Beam Strong Post
Single Face
Terminal Type MC
Sep-2009 MB 11 W-Beam Strong Post. Transition section to concrete parapet. Transition module details.
Sep-2009 MB 12 W-Beam Strong Post. Transition section on concrete parapet. Transition module details.
Sep-2009 MB 13 W-Beam Strong Post. Transition section to concrete parapet. Transition module details.
Sep-2009 MB 14 W-Beam Strong Post. Transition section to concrete parapet. Existing bridge transition upgrade.
Sep-2009 MB 14A W-Beam Strong Post. Transition section to concrete parapet. Existing bridge transition upgrade in approach slab condition.
Sep-2009 MB 14B W-Beam Strong Post. Transition section to concrete parapet. Existing bridge transition upgrade in wingwall condition.
May-1998 MB 16 Reduced Post Spacing
Dec-1998 MB 18 W-Beam Strong Post
Double Face
Connection Concrete Barrier Type C
Feb-1997 MB 19 W-Beam Strong Post
Double Face
Median Treatment
Oct-1996 MB 19A W-Beam Strong Post
Double Face
Median Treatment
Feb-1997 MB 20 W-Beam Strong Post
Double Face
Terminal Type MA- MED
Oct-1997 MB 21 W-Beam Strong Post
Double Face
Terminal Type MB- MED
Oct-1997 MB 23 W-Beam Strong Post Double Face Connection Concrete Barrier Type A
Oct-1997 MB 24 Transition W-Beam Strong Post to Weak Post Single face
Feb-1997 MB 25 Transition W-Beam Strong Post to Weak Post Single Post
Feb-1997 MB 26 Transition W-Beam Strong Post to Box Beam Single Face
Feb-1997 MB 27 Transition W-Beam Strong Post to Box Beam Double Face
Feb-1997 MB 28 Box Beam

Regresar al Comienzo de la página

 

Concrete Barrier

Date Drawing # Drawing Title
May-1998 CB 1 F Shape
Jul-1997 CB 2 Types B & C in Combination with Slotted Pipe
Apr-1996 CB 4 Open for Pedestrian Crossing
Apr-1996 CB 5 Joint with End Section and Construction Joint
Apr-1996 CB 6 End Section
Apr-1996 CB 6A End Sections
Apr-1996 CB 7 At Structure Column and Manhole Shaft
Apr-1996 CB 8 Highway Luminaire Mounting Detail

Regresar al Comienzo de la página

 

Highway Lighting

Date Drawing # Drawing Title
Jun-1996 LS 1 Standard Legend, Notes & Design Criteria
Nov-1996 LS 2 Aluminum Lighting Standard
Nov-1996 LS 3 Special Lighting Standard
Jun-1996 LS 4 Lighting Pole Installation Detail
Nov-1996 LS 5 Pole Base and Anchor Detail
Jun-1996 LS 6 Pull Box For Lighting Circuits Detail
Nov-1996 LS 7 Arm Support & Hand Hole Detail
Jun-1996 LS 8 Underpass and Pedestrian Bridge Standard
Jun-1996 LS 9 Pole Mounted Substation Standard-I
Jun-1996 LS 10 Pad Mounted Substation Standard II
Jun-1996 LS 11 Pad Mounted Substation Standard III
Jun-1996 LS 12 Median Barrier Mounting Detail
Jun-1996 LS 13 Trench Detail Standard
Nov-1996 LS 14 High Mast Lighting Standard
Jun-1996 LS 15 High Mast Detail
Jun-1996 LS 16 Temporary Lighting Standard
Dec-1998 LS 17 Alternate Bases for aluminium lighting poles
May-1998 LS 17A Alternate Bases
Precast base for round high mast
80'-0 and 100'-0 high

Regresar al Comienzo de la página

 

Impact Attenuators

Date Drawing # Drawing Title
Jan-2010 IA 1 Modules
Jan-2010 IA 2 Approved list
Jan-2010 IA 3 Typical module arrays
Jan-2010 IA 4 Alternate module arrays

Regresar al Comienzo de la página

 

Markers and Delineators

Dat Drawing # Drawing Title
Oct-1997 DLN 1 Delineators
Standard mounting
Type 1, 2, 3, & 4
Oct-1997 DLN 2 Delineators
Typical application
Types 1, 2, 3, & 4

Regresar al Comienzo de la página

 

Planting

Date Drawing # Drawing Title
May-1998 PL 1 Pruning
Broadleaf evergreens and deciduous plants
May-1998 PL 2 Pruning
Cutting procedures
May-1998 PL 3 Pruning
Location of the pruning cut
Jan-2000 PL 4 Method of planting tree seedling
Jan-2000 PL 5 Planting pits details
Jan-2000 PL 5A Planting pits details
Jan-2000 PL 6 Planting details
Staking, guying and wrapping
Jan-2000 PL 7 Slope planting details
Staking, guying and wrapping

Regresar al Comienzo de la página

 

Turf Establishment

Dat Drawing # Drawing Title
Oct-1998 TUST 1 Jute Mesh Placement

Regresar al Comienzo de la página

 

Maintenance and Protection of Traffic

Date Drawing # Drawing Title
Oct-2000 MPT 1 Channelizing Devices
Feb-2000 MPT 2 Channelizing Devices
Apr-1996 MPT 3A F Shape Temporary Concrete Barrier with Vertical I-Beam
Apr-1996 MPT 4 F Shape Temporary Concrete Barrier with Pin & Rebar
Apr-1996 MPT 5 F Shape Temporary Concrete Barrier with Side Plate
Apr-1996 MPT 6 F Shape Temporary Concrete Barrier with Wire Rope and Pin Connection
Apr-1996 MPT 7 Temporary Concrete Barrier, Positive Connecting Barrier J-J Hook Design
Apr-1996 MPT 8 Concrete Barrier, Temporary End Section
Oct-1996 MPT 8A Temporary Impact Attenuator
Apr-1996 MPT 9 Polyethylene Barrier System
Apr-1996 MPT 9A Polyethylene Barrier System
Apr-1996 MPT 10 Work Zone Design Criteria
Apr-1996 MPT 11 Typical Application Diagrams
Apr-1996 MPT 12 Typical Application Diagrams
Apr-1996 MPT 13 Typical Application Diagrams
Apr-1996 MPT 14 Typical Application Diagrams
Apr-1996 MPT 15 Typical Application Diagrams
Apr-1996 MPT 16 Typical Application Diagrams
Feb-1997 MPT 17 Typical Application Diagram
Apr-1996 MPT 18 Typical Application Diagrams
Apr-1996 MPT 19 Typical Application Diagrams
Oct-1997 MPT 20 Typical Application Diagrams
Apr-1996 MPT 21 Warning Signs
Apr-1996 MPT 21A Warning Signs
Nov-1996 MPT 22 Warning Signs
Sep-2009 MPT 23 Temporary Traffic Signs. Mounting Details

Regresar al Comienzo de la página